Given the latest developments in relation to the COVID-19 virus, at ABC we are following the instructions of local and national health organizations to avoid any negative impact that it may cause in the company's normal activity.
More informationThis work consists in the supply and commissioning of a total of 8 compressor units for two single cycle generation plants in Argentina. As the pressure in the gas network is limited and fluctuating, the purpose of this compressor installation is to provide the constant gas pressure capacity required in the generation gas turbines. The two generation plants are located in Matheu (254 MW) and in Luján (127MW). They consist of four and two TRENT 60 gas turbines respectively.